Saturday, 12 October 2013

House leaking

The issue is finally done. The water flow in from the edges of the pipe at the top roof to first floor toilet and then to ground floor toilet.

Hooray! All holes are closed and tidy up! Left painting which can be done tomorrow. :-)

No comments:

Post a Comment